Active Image
0Charles de Gaulle (R 91) (2001) - primary image
France

France

Charles de Gaulle (R 91) (2001)

Nuclear Aircraft Carrier · Cold War to Modern
Heller · 81072 · 1/400 · 2021
our price
£44.99 GBP
rrp
£49.99
you save
£5.00 (10%)
availability: in stock (low) this item will usually be dispatched within 2 working days.
shipping: worldwide this item can be sent anywhere in the world
add to basket
Your cart
Charles de Gaulle (R 91) (2001)
Charles de Gaulle (R 91) (2001)
Regular price
£49.99
Sale price
£44.99/ea
£0.00
Regular price
£49.99
Sale price
£44.99/ea
£0.00

add to wishlist
type length width

Plastic model kit

654mm

161mm

View full details

This boxed set contains:

  • 1 x Charles de Gaulle (R 91) (2001) 1/400 scale nuclear aircraft carrier
1:
French Navy
Charles de Gaulle (R 91) (2001)
French Navy

The story of the Charles de Gaulle began in 1974, when the oil crisis shook the industrialised countries. In this context, the French government decided to launch the construction of the Porte- Hélicoptères-75, a 16,400-ton helicopter carrier equipped with nuclear boilers, a project that was eventually abandoned. In 1982, the French Navy High Council requested that the studies carried out for the nuclear propulsion of the PH-75 project (which in the meantime had become Aircraft Carrier-75 and then PA-83) be used to define a new generation of aircraft carriers capable of replacing the Clemenceau and Foch before the end of the century. Nuclear propulsion gives the vessel the possibility of remaining at sea longer without the need to refuel. More than 10,000 plans were drawn up by the engineers of the Direction des Constructions Navales (DCN), and on 4 February 1986, the construction of the ship christened Charles de Gaulle was authorised. It was launched on 7 May 1994 and commissioned on 18 May 2001. A true technical feat, this aircraft carrier has a system of 12 mobile masses of 22 t which compensates for rolling movements and enables the ship to use its aircraft on board by sea at force 5 or 6. The Charles de Gaulle‘s shapes are „stealthy“ to reduce its radar signature to make it less easily identifiable. In 2020, France is the only country, apart from the United States, to have completed the construction of a nuclear-powered aircraft carrier.

This boxed set contains:

  • 1*Charles de Gaulle (R 91) (2001) 1/400 scale nuclear aircraft carrier

The story of the Charles de Gaulle began in 1974, when the oil crisis shook the industrialised countries. In this context, the French government decided to launch the construction of the Porte- Hélicoptères-75, a 16,400-ton helicopter carrier equipped with nuclear boilers, a project that was eventually abandoned. In 1982, the French Navy High Council requested that the studies carried out for the nuclear propulsion of the PH-75 project (which in the meantime had become Aircraft Carrier-75 and then PA-83) be used to define a new generation of aircraft carriers capable of replacing the Clemenceau and Foch before the end of the century. Nuclear propulsion gives the vessel the possibility of remaining at sea longer without the need to refuel. More than 10,000 plans were drawn up by the engineers of the Direction des Constructions Navales (DCN), and on 4 February 1986, the construction of the ship christened Charles de Gaulle was authorised. It was launched on 7 May 1994 and commissioned on 18 May 2001. A true technical feat, this aircraft carrier has a system of 12 mobile masses of 22 t which compensates for rolling movements and enables the ship to use its aircraft on board by sea at force 5 or 6. The Charles de Gaulle‘s shapes are „stealthy“ to reduce its radar signature to make it less easily identifiable. In 2020, France is the only country, apart from the United States, to have completed the construction of a nuclear-powered aircraft carrier.

Contact Us